作者高级词汇积累做的很棒,但总体词汇丰富度要加强;加强一些长句和复杂句的使用;连接词过少,建议增加衔接词汇的积累。
Temperature and humidity record chart should add warning line Test testing files is not centralized. There are singned samples and un-signed samples in approved sample The material of coming inspection, which should reserve sample The Mantissa box has not pasted lable to include P/N,quantity and PASS stamp, The testing machine has not used checking sample to check, FQC testing head has not hang lift control card, IPQC and OQC standard inspection specification are inconsistent, provide lot Tracing case, SPC statistics and management is not enough, Inspected product and waiting product has not identified clearly and not put it together, SATA HDMI Production factory area attachment planning, Provide Luxshare-ict company profile, Provide SASP company profile,